Project Suppliers:four

View an extensive list of companies that participated in the design and build of the London Aquatic Centre.

1 MIN READ

HUFTON+CROW

• Aquatic Consultant: Devin Consulting Ltd.

• Bulkheads: VARIOPOOL BV

• Chillers: Johnson Controls Inc.

• Circulation Systems/Gutters: Insitu concrete

• Controller/Control System: ProMinent Fluid

Controls UK Ltd.

• Electrical Switchgear: E&I Engineering Ltd.

• Enclosure: Insitu concrete

• Filtration: Euro Pools, plc

• Floor Covering, Tiles: Klinker Sire

• Heater Exchangers:

• HVAC Systems: GEA Air Treatment

• Lighting:Philips Lighting

• Lockers: PROSPEC LTD.

• Movable Floor: VARIOPOOL BV

• Pumps: Grundfos Pumps Ltd.

• Racing Lines:Malmsten

• Seating/Bleachers:

Ferco Seating Systems Ltd. (legacy)/ Shanghai Haobo Chair Co. Ltd. (Olympic)

• Springboards: Duraflex International Maxiflex Model B supplied by Dive Gym Equipment Ltd.

• Timing System: Swiss Timing

• Uninterrupted Power Supply: GE Digital Energy

About the Author

No recommended contents to display.